Wii Les Paul Revival Kit Installation Guide
Introduction
This is an instructional guide for the RetroCultMods Revival Kit for the Wii Les Paul. This build can be completed in under an hour and a half, but can take longer if you are thorough with the cleaning process. If you run into any issues during the build or have questions, click here!
Parts Included
- Revival Kit Zeroboard (Strumboard/PCB)
- Revival Kit Fretboard
- Replacement Analog Stick Board for Wii Les Paul
- Replacement Start/Select board for Wii Les Paul
- USB-C Port Assembly for Les Paul
- 3D Printed Translucent Strumbar for Wii Les Paul
- 5x 3D Printed Translucent Frets
- 3D Printed Kit Hardware
- Hall Effect Whammy Assembly
- Kits ordered before September 9th, 2026 have the potentiometer Whammy Assembly. This has a specific set of instructions in the whammy install section.
- Switch Puller
- Color Coded Wires and Auth Cable
- 10 foot nylon braided USB-A to USB-C cable
- Tube of lubricant
Required Tools (not included)
Step-by-Step Installation Guide
1. Opening the Guitar
Flip the controller over so the Red Octane sticker on the back of the body is visible. The type of screws used on the outside shells will depend on the model of your guitar:

Rear body shell – 11x T10 screws

Rear neck shell – 5x T10 screws

Front neck screws under faceplate - 4x PH1 screws
Ensure that all screws are removed, and open the shell.
Once the shell begins to open, slowly move down the rest of the shell until it pops open completely.
Repeat this process for the neck, using the opening at the neck connector and working towards the headstock.
If the shell seems to get stuck, DO NOT FORCE IT. Check to make sure you have removed all of the screws before continuing to pry the shell.
2. Removal of Original Parts
Now its time to remove the stock boards that will be replaced with the new boards included in the kit.

Remove the 4x screws on the stock Strumboard.
Remove the 2x screws on the stock Start/Select Board.
Remove the 4x screws on the stock D-Pad Input board.
Remove the 2x screws on the RJ11 port.

Remove the 2x screws from the stock Fretboard.

Wiggle the wires near the whammy potentiometer until they break free or use scissors to cut the wires.
Once all the screws are removed, remove all of the stock boards along with the whammy assembly from the shell. You will need to keep the following parts of the whammy assembly:
3. (Optional) Clean Your Guitar
In this step, we take a little bit of time to clean some parts of the guitar. We suggest being more thorough in your cleaning, as your guitar may have finger grime from way back in the day! A bit of rubbing alcohol and/or soap and water can go a long way. Make sure the parts are fully dry if you clean with soap and water. Pro tip: Toothbrush, Dawn soap, and water.
4. Test Your Revival Kit
Before installing the Revival Zeroboard/Strumboard and Revival Fretboard, they should be tested for proper functionality.
Gather the Revival Kit Fretboard, 3 white wires, and 10ft USB-C cable
Plug the Revival Fretboard into the Revival Zeroboard/Strumboard using the three included white cables. Make sure that each connection goes to the proper port. It is suggested to go one by one while installing.

Plug in Fret 1, Fret 2, and RGB to the Revival Fretboard

Plug in Fret 1, Fret 2, and RGB to the Revival Strumboard
Plug your Revival Zeroboard/Strumboard into your computer, using the USB-C to USB-A cable included in the Revival Kit. You will plug it into the vertical USB-C port on the Zeroboard.

Open the RCM Programming Tool (click here to go to the download page). If the following screen appears for you, make sure to switch the DEVICE TYPE to "Revival Kit". Click Erase and Configure. Do not touch the device while it is being programmed.

Once the firmware writing is complete, this screen will appear:

Scroll down to the list of all inputs and then start pressing the fret and strum switches. The respective switches will light up and so will the input in the RCM Programming Tool. Verify that all of the inputs and switches work properly. If not, contact support.

5. Prepping the New Strumbar (RGB Only)
IF YOU DID NOT ORDER THE 3D PRINTED CLEAR STRUM BAR, SKIP THIS STEP. Before installing the new Strumboard, we need to transfer some pieces of the stock strumbar over to the new one:
Gather the 3D printed strum bar, tube of lubricant, and 3D printed bits from the bag of screws
Remove the two black strum bar brackets, then pull the strum bar assembly out of the guitar.

Remove the metal strumrod by pulling it out of the stock strumbar.

Remove both of the circular spacers on each end of the strumbar. You can easily remove these by pushing them out with your finger from the inside of the strumbar.

Remove the four rubber pads on each foot of the strumbar. These can be lifted straight out of their slots.

Make sure you have all the stock parts you need:
-
1x Metal strumrod
-
2x Circular spacers
-
4x Rubber pads
-
Find the white tube of lubricant and apply a very small amount on each end of the metal strumrod, where it makes contacts with the circular spacers. Use for finger or a qtip to spread the lubricant out; we want only a thin layer of lubricant on the ends of the strumrod!

Put all of these parts into the new strumbar, in the same places as the stock strumbar. Insert the rubber pads into the slots in each of the feet of the new strumbar, insert the spacers into the circular cutouts on each end of the new strumbar, then insert the metal strumrod through the spacers.

If the strumbar slides up and down the metal rod too much for your liking, then you can install the wide, thin spacers included on the end of the component piece to fill in the gap. Place these under the stock strumbar spacers. You may need to stack multiple on each end to get your desired tolerance!

6. Installing the Revival Zeroboard (strumboard)
Slide the metal rod into the new strumbar. Then place the new strumbar into the slot that the stock strumbar sat in. Put the black brackets back into place.

Separate the small strum keycaps from the component piece and slot them into the stems of the strum switches. This is needed for a tighter strumbar feel.

Place the new strumboard on top of the black brackets, then screw in the new strumboard. If the stock screws are stripped, you can use the replacement Long Screws provided in the kit. Make sure each screw is snug, but do not over-tighten them, or you may scratch away the soldermask of the new strumboard!

7. Installing the Revival Fretboard
Gather the Revival Kit Fretboard, Translucent Frets, 3 White Wires, and 2 Long Screws.
Connect one end of each of the White Wires into the RGB, FRET1, and FRET2 connectors on the Fretboard. Connect the other end of each White Wire to the corresponding RGB, FRET1, and FRET2 connectors on the Strumboard. We recommend doing one wire at a time to prevent mixing them up.

Plug in Fret 1, Fret 2, and RGB to the Revival Fretboard

Plug in Fret 1, Fret 2, and RGB to the Revival Strumboard
Remove the stock silicone pad and frets if they are still in the fret slots. Wipe the inside of the fret slots clean if they are dirty. Then apply a small amount of lubricant to your finger or a qtip and lightly coat the inside of the fret slots with lubricant. Make sure to wipe away any excess lubricant that may have spilled to the front of the neck shell!

Insert the translucent 3D printed frets provided in the kit. These frets must be used even if you do not want to use LEDs; the stock frets will not fit with the new Fretboard.

Place the new Fretboard onto the screw standoffs that the stock fretboard used to sit on (the red switches and white connectors should be facing down towards the Translucent Frets. Use 2 Long Screws to secure the new Fretboard.

Route the White Wires through the neck and down through the body. Make sure they are clear of any screw standoffs so they are not damaged when reinstalling the neck shell. Using a bit of tape to hold down the wires internally can help with management.

8. Installing the Start/Select Board
Gather the new Start/Select board (labeled 1A) and 2 Long Screws.
Remove the silicone domes on the stock Start/Select board by pulling upwards on the silicone domes.

Position the domes on the side of the new Start/Select board (labeled 1A) with the gold pads. Do not worry about centering the silicone domes.

On the opposite side of the new Start/Select board, pinch the legs of the silicone domes and pull upward to secure them onto the new Start/Select board.

Secure the new Start/Select board in the place of the stock Start/Select board, positioned with the white connector closest to the Strumboard. The original screws will likely be too small to cover the slots of the new board, so the provided screws can be used instead.

Connect one end of the Red Wire into the white connector on the new Start/Select board.

Connect the other end of the Red Wire into the white ST/SEL connector on the Strumboard.

9. Installing the Analog Stick Board
Gather the new Joystick board (labeled 2C), and 3 Long Screws.

Remove the Joystick cap from the stock Joystick board.

Slide the Joystick cap onto the Joystick of the new board (labeled 2C).

Secure the new Joystick board where the stock Joystick board previously was. You can use the provided screws if the stock screws are stripped.

Plug one end of the Green Wire into the white connector closest to the Strumboard.

Plug the other end of the Green wire into one of the white connectors labeled JOY on the Strumboard. We recommend using the connector on the bottom of the board, as the wire routes nicely that way.

10. Installing the USB-C Port Assembly
Gather the USB-C board, bracket (without the X on it), and shroud. Gather 2 Short Screws and 2 Long Screws.

Install two short screws into the bracket from the bottom until they start to poke out of the other side.

Line up the USB-C board into the top of the bracket, ensuring the screws go through the holes in the board. Push the shroud on top of the USB-C connector on the board.

Finish screwing in the short screws from the bottom of the bracket. You will want to press the shroud down onto the connector while you finish installing the screws.

Use two long screws to mount the assembled USB-C module where the RJ-11 port used to sit.

Plug one end of the Yellow Cable into the white connector of the USB-C module.

Plug the other end of the Yellow Cable into the white connector on the Strumboard labeled USB.

11. Installing the Authentication Cable (optional)
Plug the white connector end of the Authentication cable into the white connector on the Strumboard labeled AUTH.

Route the Authentication cable through the slot that the Wii extension cable used to route through.

12. Assembling and Installing the Whammy
Revival Kits ordered after September 8th, 2026 have the new hall effect whammy sensor design.
Gather the following parts: Hall Effect sensor, Magnet Bracket, Adhesive pad, and black connector cable.

Peel back the red film on the adhesive pad and place it on the empty area of the Hall Effect Whammy board. Tweezers will make this much easier!

Peel the white film on the adhesive pad and position the board onto the inner shell of the guitar with the black rectangular sensor close to the edge of the black plastic whammy assembly as pictured. Make sure the board and the assembly are not touching.

Locate the magnet bracket and slide the magnet into the slot on the front of the bracket. Push it in until it is about flush with the opening of the slot.

Line up the seam on the underside of the bracket to the thin wall in the center of the whammy assembly. Press the bracket down onto the assembly as far as it will go.

Connect one end of the black wire to the connector on the sensor board.

Connect the black wire to the WHAMMY connector on the Zeroboard.

The following video is a guide for installing the previous whammy design.
13. Test Inputs
Plug your guitar into your computer using the new USB-C port you installed!
Open the RCM Programming Tool on your computer (click here to go to the download page) If the following screen appears for you, make sure to switch the DEVICE TYPE to "Revival Kit". Click Erase and Configure. Do not touch the device while it is being programmed.

You will then be brought to this screen, click Configure.

Scroll down to the list of all inputs and then start pressing the frets and clicking the strum bar. The respective switches will light up and so will the input in the RCM Programming Tool. Verify that all of the inputs and switches work properly. If not, contact support.

14. Closing the Guitar
You're almost done! Once you have ensured that each input works, we can close up the guitar! Make sure none of the wires are in the way of any plastic standoffs, as this will damage them when closing the shell. We would recommend taping down the wires to ensure they are out of the way and not draped across any of the boards. With the front body and neck shell facing down, put the rear neck shell onto the front neck shell. You may need to apply pressure to close the shell. If you feel like part of the shell will not snap into place, open it up and double check that there is nothing blocking the standoffs. Repeat for the body shell. DON'T FORGET THE STRAP PEGS! After both sides of the body are connected, install all of the screws you removed earlier:

Rear body shell – 11x T10 screws

Rear neck shell – 5x T10 screws

Front neck screws under faceplate - 4x PH1 screws
15. Calibrate Tilt and Whammy
Plug the guitar back into your computer and open RCM Programming Tool. Click Configure.
Tilt
Open the RCM Programming Tool
Plug the guitar into your computer
Click the Configure button

Click the Tilt dropdown menu

Click Calibrate

Posture the guitar in your normal playing position, then click Next. After that, posture the guitar in the height that you would like for tilt to activate and hold it in that position while clicking Next again. Your tilt should now be calibrated!
If you feel like the tilt needs to be adjusted, just calibrate again!
Whammy
Click the Whammy dropdown menu.

Click Calibrate.

Without touching the whammy bar, click Next. Then, push the whammy bar further in (like furthest activated) without pushing too hard to damage it. Hold it in that position, then click Next.
Now you're setting the Deadzone. The Deadzone is where the whammy begins activation. So you want to make it to where the whammy cannot actuate unless you intentionally press it inwards. Once you've set that, click Next.
You're done! If you find that the deadzone isn't quite right, you can adjust it via the slider or by recalibrating.
16. Configure Fret and Strum Bar Colors
Open RCM Programming Tool if you do not already have it open
Scroll to the fret and strum inputs and click the arrow to reveal the color selectors for your chosen input.


Click on the arrow for the pressed or released LED color to open the color picker menu:

Change this to whatever color you want!
Click Save Settings when you've configured all of the colors that you want.

17. Finishing Up, Factory Resets and Updates
To wrap up this installation, the last things to know are how to factory reset and/or update the guitar.